Urban Transit

Doha Metro Green Line Stations — MEP Works
A 42-month tunnel construction programme integrating MEP works into architectural and civil drawings. In just 18 months we delivered over 200 sheets and 50+ system-assurance details covering smoke detection, MEP shafts, and auto shut glass panels.


Key Highlights
- Design integration of MEP works within architectural and civil drawings
- 200+ sheets and 50+ system assurance details delivered in 18 months
- Clash detection via interdisciplinary review (IDR) using Navisworks
- Successful digital delivery through ProjectWise (CDE)
- Location
- Doha, Qatar
- Sector
- Urban & Infrastructure
- BIM Scope
- BIM LOD 300
- Scope of Work
- MEP design integration across 2 × 16.5 km tunnels, six stations, one external switch hall, four emergency shafts up to 40m deep, 32 cross-cuts, and two combined MEP shafts.
- Services Involved
- BIM Services
More in Urban & Infrastructure
View AllSimilar Scope?
Bring us a project like this one.
Share your drawings or a brief and we'll map out the fastest path forward.



